Interior Fit-Out Singapore.
Turnkey interior construction for offices, F&B venues, and retail spaces in Singapore. Tight timelines for open-by dates. MCST coordination, after-hours scheduling, and tenancy-compliant works in live-tenanted buildings.
Fit-Out Scope
Bare shell to opening day.
We deliver fit-out projects across the three main commercial categories. Each has its own coordination requirements — F&B brings SFA, NEA, and SCDF; office brings MCST and tenancy compliance; retail brings landlord design rules and short open-by deadlines.
- ▸ Office fit-outs (CBD, business parks)
- ▸ F&B build-outs (full kitchen, dining, bar)
- ▸ Retail and flagship store construction
- ▸ Showrooms and corporate experience spaces
- ▸ Co-working and serviced office build-outs
- ▸ Demolition and structural alterations
- ▸ Partitioning (drywall, glass, demountable)
- ▸ Ceiling systems (suspended, bulkhead)
- ▸ Electrical, lighting, and data cabling
- ▸ ACMV and ventilation modification
- ▸ Plumbing for pantries, F&B kitchens, restrooms
- ▸ Fire-rated works and SCDF compliance
- ▸ Joinery, millwork, and bespoke fixtures
- ▸ Signage and external shopfront
Fit-Out Process
Five stages. Designed to hit the open-by date.
-
01
Tenant Brief & Material Procurement
Site survey of bare shell or existing fit-out. Coordinate with your appointed designer on materials, finishes, and specialist items. Long-lead items (custom joinery, imported tiles) ordered immediately to protect the schedule.
-
02
Building Management Coordination
MCST submission for commercial buildings: scope, hours, deposit, insurance certificates. SFA / NEA / SCDF for F&B. Landlord design submissions for retail. We carry the approval timeline risk so you don’t.
-
03
Demolition & Civil Works
Soft strip of existing finishes. Structural alterations (where permitted by landlord). Hacking and disposal scheduled for after-hours in live-tenanted buildings. Dust protection on adjacent units throughout.
-
04
Wet Trades, M&E & Finishes
M&E first fix (electrical, ACMV, plumbing). Wet trades (tiling, painting, screed). Joinery installation. Final M&E commissioning and lighting balancing. Daily clean-down because public traffic is metres away.
-
05
Snagging & Open-Day Handover
Pre-handover snag walk with the tenant team. Defects rectified within 48 hours. Building management final inspection. Open-by date hit. 12-month defects liability period for any latent issues.
Why Lee & Co for Fit-Out
We hit open-by dates.
Landlord & MCST Fluency
We work with the same building managements repeatedly across CBD towers, business parks, and shopping malls. Approval submissions are clean on first pass because we know what each landlord wants.
Long-Lead Discipline
On day one we order the long-lead items — custom joinery, imported tiles, specialist lighting. The schedule stays intact because we don’t wait for the kick-off meeting to start procurement.
After-Hours Crew Capacity
For live-tenanted buildings, we run dedicated night-shift crews for noisy trades. Day labour is reserved for quiet finishing work. The cost differential is shared transparently in the open-book quote.
Frequently Asked Questions
Questions we hear most often.
-
What does an interior fit-out contractor in Singapore actually do?
An interior fit-out contractor takes a bare-shell or existing tenanted unit and converts it into a fully functional, finished space — office, F&B, retail, or showroom. We handle demolition (where applicable), partitioning, ceiling, flooring, M&E (electrical, ACMV, plumbing), joinery, painting, lighting, and final snag. Single contract, single accountability, ready to open by the agreed date. -
How long does an office fit-out take?
A typical Singapore office fit-out (200–500 sqm, mid-spec) runs 8–12 weeks on site, plus 2–3 weeks for building management approvals before site start. F&B fit-outs can run 12–16 weeks because of grease trap, exhaust hood, and SFA requirements. Retail varies widely — a small retail unit can fit out in 6 weeks, a flagship store can take 16+ weeks. -
Do I need building management approval for fit-out?
Yes. For commercial buildings under MCST, you need building management approval before any tools come on site. Approval covers: scope of works, permitted hours (typically after-hours for noisy work in occupied buildings), waste removal route, deposit lodgement, and contractor insurance certificates. We manage the approval process as part of our scope. -
What’s included in a turnkey fit-out contract?
A turnkey contract covers everything from bare shell to opening day: design coordination with your appointed designer, demolition, structural alterations (where permitted), partition walls, ceilings, flooring, electrical and lighting, ACMV, plumbing, fire-rated works, joinery and millwork, signage, painting, final clean, and snagging. Loose furniture (tables, chairs) is usually a separate FF&E supply. -
Can fit-out works happen after-hours in occupied buildings?
Yes — this is standard for live-tenanted buildings. We typically work 7pm–7am for noisy trades (drilling, hacking, cutting) and reserve daytime for quiet trades (painting, joinery installation). Building management dictates the exact hours. We staff for night shifts when needed and pass through the labour cost differential transparently in the open-book quote. -
How are fit-out projects priced?
Most Singapore fit-outs are priced lump sum based on a fixed scope, since the design is locked before tendering. We offer open-book costing on request, where you see supplier quotes for each trade. Variations during works are priced from the same supplier rates — no inflated “variation premium”.